Useful pages
Measurement on the Linac 2
- Tank 1 measurements of 2 June 1999.
- First measurements with IT-BSM2 220300. Shows that we should
not measure on the short beams (only after the PSB injection trigger).
- After Tank 1 with IT-BSM1 giving beam parameters and the
currents through the Linac as a function of the tank 1 phase.
- After Tank 1 with IT-BSM1 (Fbunch
v Frf) giving beam parameters and the
currents through the Linac as a function of the tank 1 phase, new
measurements of 20 Nov 2001. With comparison of simulation.
- After Tank 1 with IT-BSM1 (Fbunch
v Arf) giving beam parameters and the
currents through the Linac as a function of the tank 1 phase, new
measurements of 03 Oct 2001. With comparison of simulation.
- After Tank 2 with IT-BSM2 giving beam parameters and the
currents through the Linac.
- After Tank 2 with IT-BSM2 as a funtion of the amplitude.
Reports